Minga cut infra costs 30-40% - and it scales itself | Control Plane
Minga checks in 1.5 million students across the eastern seaboard by 8:30 AM Eastern — then lets that infrastructure wind down an hour later. After migrating to Control Plane, they cut infrastructure costs 30–40% and traded fragile, manual scaling for a platform that scales itself.
In this short, Minga's team breaks down what changed:
→ 30–40% lower infrastructure costs after migrating
→ Smoother scale-out — no more traffic spikes slowing everything down
→ 10 pods overnight down to 3, ramping back up fast enough that no one notices
→ Every dollar saved on infra goes straight into building new features
Control Plane gives you the full power of the hyperscalers — any cloud, any region, any backing service — through a platform your team (and your AI agents) can actually operate. Faster on day one, flexible enough to scale without rearchitecting.
#CloudInfrastructure #MultiCloud #DevOps #Kubernetes #CloudCost #Scaling